If your scratches are too deep or you have several of them on one plank you might need to replace the damaged boards.
Replacing laminate boars.
Laminate flooring uses a glueless and nail free system.
Since you must level either type of subfloor before laying tile if you decide that you want to replace a tile floor with laminate flooring you won t need to do as much work to make sure the floor sits level.
Replace the scratched boards.
If spacers were used between the wall and the board closest to it replace them with smaller spacers.
Now it comes time for the replacement laminate plank.
Unlike solid wood flooring which is nailed.
The best tool to do it will be a vibratory undercut saw.
Laminate floors are a boon for homeowners who want the look of a wood floor without the hefty price tag.
Use a hammer and chisel or putty knife to remove baseboards or molding near the damaged boards.
Tile will last forever under normal conditions but carpet and laminate may need replacement in ten years or less.
Laminate flooring brands may also require trimming of the groove along a short edge so the new plank will sit in place.
Place a board right up against one of the boards that are still on the floor and join them together at the laminate joint.
The repair process is basically the same.
Laminate floor buckling like lifting can be caused by changes in temperature and humidity levels.
You can fix minor chips and scratches in a laminate floor with filler products.
When a board sustains damage in the middle of a laminate floor you have two options for replacing it.
But if the damage is severe you have to replace the plank you did save a few from the installation right.
That means that it s easy to replace small portions of flooring when necessary.
Step 3 install the new laminate.
Hardwood properly maintained can last for decades but it may require more.
You have to cut off the tongue on both sides the short and long edge of the board.
Both tile and laminate flooring planks can be installed over wood or concrete subfloors.
Sometimes putty and wax is not enough.
Discard the boards that are damaged.
One is to disassemble the floor down to the damaged board replace the board and reassemble.
It s a job you can do yourself in about two hours.